S. No |
Project Description |
Status |
1 |
SEC CONTRACT:
CONNECTING SCADA SIGNALS AND READINGS - QASSIM AREA. FINAL ACCEPTANCE DATE: 21/08/2023 |
Completed |
2 |
SEC SERVICE CONTRACT
SCADA EQUIPMENT SERVICE CONTRACT FOR VARIOUS SUBSTATIONS 380KV, 220KV AND 115KV IN EOA.
(5 YEARS CONTRACT APR 2016 TO APR 2024) |
Completed |
3 |
SUPPLY OF RECONFIGURATION SERVICES OF EXISTING DSM & TFR @ WADI DAWASIR 380KV. (4 380KV LINES + 2 380KV LINE REACTORS) |
Completed |
4 |
SUPPLY OF 9 NO'S OF G100 PDS RTU'S UPGRADE IN ALBA, BAHRAIN - DESIGN, ENGINEERING, MATERIAL, INSTALLATION, TESTING & COMMISSIONING @ RTU'S |
Completed |
5 |
SUPPLY OF JUNIPER SWITCHES TO SEC |
Completed |
6 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF GE SOER EXPANSION AT QASSIM-2 (9025) 380KV BSP. |
Completed |
7 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF RTU EXPANSION @ BERRI SUB 40 |
Completed |
8 |
SUPPLY OF RTU & SOER TESTING & COMMISSIONING SERVICES @ RAKAH (RTU-MICROSOL & SOE-GE), DAMMAM PP & GHUNAN. |
Completed |
9 |
NETWORKING & SECURITY SYSTEM FOR AL ESTAGAMAH GLOBAL GROUP COMPANY @ NEW OFFICE IN DAMMAM. |
Completed |
10 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF SCADA RTU, SOER EXPANSION SERVICES @ AL JOUF-B & SAKAKA-A |
Completed |
11 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF DSM @ HARADH 380/230KV & SCADA & SOE EXPANSION @ HAWIYAH 380KV. |
Completed |
12 |
SUPPLY OF FMK PANEL, GE D20 RTU MODULES @ SS-7088, SS-7199 & SS-7260 AND INSTALLATION OF MODULES, TESTING & COMMISSIONING. |
Completed |
13 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF NEW RTU&SOER @ NEW ZALLUM VILLAGE & EXPANSION @ MARKAZALLUM S/S'S. |
Completed |
14 |
ALBA LINE 6 EXPANSION, POWER DISTRIBUTION SYSTEM PROJECT - DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF GE LOCAL RTU, RTU1 EXP, SH6 & SH8 EXP., SPARE D20 RTU, SPARE D200 RTU & SPARE D25 BCU @ ALBA, BAHRAIN |
Completed |
15 |
SUPPLY OF SCADA AND SOER SYSTEM COMMISSIONING WORKS AT VARIOUS 110 KV & 380KV SUBSTATIONS OF SEC-WEST |
Completed |
16 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF SCADA RTU & SOER EXPANSION WORKS @ VARIOUS S/S'S |
Completed |
17 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, TESTING & COMMISSIONING OF PORTABLE SOER HMI @ VARIOUS S/S'S. |
Completed |
18 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, INSTALLATION, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF 4 DSM SYSTEMS @ S/S'S 8910, 8938, 8936 & RAFHA-C. |
Completed |
19 |
SCADA RTU RECONFIGURATION/ EXPANSION WORKS - AT MAHASEN BSP |
Completed |
20 |
RTU & SOER SERVICES @ KHAFJI - RECONFIGURATION WORKS |
Completed |
21 |
RECONFIGURATION SERVICES @ ARAR-A (RTU, SOER & DFR) & ARAR-B. (RTU & SOER) |
Completed |
22 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, SYSTEM INTEGRATION, TESTING & COMMISSIONING OF NEW SOER @ UTHMANIYAH PLANT |
Completed |
23 |
CONSTRUCTION OF SAKAKA-D 132/13.8KV SUBSTATION & EXTENSION OF 132KV GIS -
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF DSM SYSTEM @ SAKAKA-D |
Completed |
24 |
CONSTRUCTION OF UNAYZAH HOUSING PROJECT 132/13.8KV SUBSTATION # 8835 - DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF DSM SYSTEM @ UNAYZAH |
Completed |
25 |
SUPPLY & INSTALLATION OF 250KVAR PANEL, APFC CONTROLLER AND TESTING & COMMISSIONING OF CAPACITOR BANK. |
Completed |
26 |
SUPPLY OF DFR SERVICES @ HHR2 FOR 2 CKTS. |
Completed |
27 |
SUPPLY & INTEGRATION OF PLC PANEL FOR SADAF SALT PLANT |
Completed |
28 |
SUPPLY OF RELAY MODULE PANELWITH INTERNAL WIRING (RELAY TO BE SUPPLIED BY NAFFCO) |
Completed |
29 |
SUPPLY OF XMU PANEL ASSEMBLY, WIRING, TESTING AS PER BOQ PROVIDED BY REACTIVE TECHNOLOGIES EXCLUDING MODEM |
Completed |
30 |
SUPPLY OF ABB SCADA RTU MODIFICATION AT JFH 380KV BSP |
Completed |
31 |
SUPPLY OF ASBUILT DRAWINGS (AUTOCAD TO MICROSTATION AS PER SEC STANDARD SEEDS-II CAD. - QURRAYYAH CITY S/S |
Completed |
32 |
SUPPLY OF DSM CONFIGURATION, T & C SERVICES AT HARADH 380KV BSP |
Completed |
33 |
SUPPLY OF MIMIC PANELS |
Completed |
34 |
SUPPLY OF STATUS MODULES ALONG WITH DESIGN, SUPPLY, INSTALLATION IN THE EXISTING CABINETS, CONFIGURATION, T & C AT AZIZIYAH SWCC. |
Completed |
35 |
SUPPLY OF RO PLC SYSTEM PANEL UPGRADE |
Completed |
36 |
SUPPLY OF RELAY MODULE PANEL WITH INTERNAL WIRING AND PANEL TO PANEL WIRING (RELAY SPPLIED BY NAFFCO) |
Completed |
37 |
SUPPLY OF ABB RTU EXPANSION/MODIFICATIONS @ 9008 |
Completed |
38 |
132kV Jizan North- ABB 560 RTU Extension/Modification |
Completed |
39 |
SUPPLY OF PDMS SYSTEM @ SWCC |
Completed |
40 |
SUPPLY OF NEW PLC PANEL ASSEMBLY SERVICES FOR PUMP STATION PS-56A |
Completed |
41 |
SUPPLY OF SOER SERVICES AR QASSIM-2 (9025) - 4 Lines |
Completed |
42 |
SUPPLY OF SERVICES FOR HYDRAULIC COMPONENTS
(3 Years Contract) |
Completed |
43 |
SUPPLY OF RTU SERVICES @ SHEDGUM GAS PLANT (V71-P4) (INTEGRATION SERVICES BETWEEN RTU & RELAYS) |
Completed |
44 |
DATA COLLECTION SERVICES @ RABIGH POWER PLANT. DAY RATES (PO VALUE CONSIDERED FOR 10DAYS INITIALLY) |
Completed |
45 |
SUPPLY OF LOCAL CONTROL STARTER PANEL DESIGN & INTEGRATION SERVICES FOR ARAMCO MARINE FACILITIES, TANAJOB. |
Completed |
46 |
SUPPLY OF PLC PANEL ADDITIONAL ASSEMBLY SERVICES FOR FAT & PUNCH POINTS CLEARANCE. |
Completed |
47 |
SUPPLY OF SERVICES FOR VALVES & ACTUATORS. (SR 550/UNIT)
3 YEARS SERVICE CONTRACT. |
Completed |
48 |
SUPPLY OF SERVICES FOR TROUBLESHOOTING AND FAULT FINDING OF BOOSTER STATION. SUPPLY OF PROTOCOL CONVERTER AND COMMISSIONING. |
Completed |
49 |
COMMISSIONING SERVICES OF SOER @ RABIGH |
Completed |
50 |
SUPPLY OF ASBUILT DRAWINGS (AUTOCAD TO MICROSTATION AS PER SEC STANDARD SEEDS-II CAD. - RABWA S/S |
Completed |
51 |
SUPPLY OF SERVICES:
OIL TESTING FOR TRANSFORMERS |
Completed |
52 |
SUPPLY OF ASBUILT DRAWINGS (AUTOCAD TO MICROSTATION AS PER SEC STANDARD SEEDS-II CAD. - IZDIHAR S/S |
Completed |
53 |
SUPPLY OF SERVICES FOR HI-POT TESTING CABLE 150SQMM |
Completed |
54 |
SUPPLY OF SERVICES FOR TRANSFORMER OIL TESTING DGA & BDV - 12 NOS. |
Completed |
55 |
SUPPLY OF ASBUILT DRAWINGS (AUTOCAD TO MICROSTATION AS PER SEC STANDARD SEEDS-II CAD. - HEET S/S |
Completed |
56 |
SUPPLY OF INSTALLATION SUPERVISION SERVICES FOR QUALITROL MAKE DSM/TFR/FL SYSTEMS. - KHAMIS MUSHAYAT |
Completed |
57 |
SUPPLY OF PLC SERVICES |
Completed |
58 |
SUPPLY OF INSPECTION SERVICES @ JIF & KHAMIS MUSHAYAT FOR QUALITROL TFR/DSM/FL |
Completed |
59 |
SUPPLY OF GE 20 RTU PARTS (WESDAC D20A MODULES - 5NOS). |
Completed |
60 |
SUPPLY OF SERVICES: MAINTENANCE AND TESTING OF 13.8KV TRANSFORMER, EARTH PIT RESISTANCE MEASUREMENT & SUPPLY AND INTALLATION OF LV DB FOR MPC JAL VILLAGE. |
Completed |
61 |
SUPPLY OF SIEMENS LOGO PLC & SERVICES & EMERGENCY SERVICES |
Completed |
62 |
SUPPLY OF SCADA ABB RTU & SOER EXPANSIONS @ NAMERAH BSP |
Completed |
63 |
RTU & SOER SERVICES @ GHUNAN & GHAZLAN (DAY RATE: 4000/DAY) |
Completed |
64 |
SERVICES @ SANG AND MVAR METERS CONFIGURATION @ VARIOUS SITES |
Completed |
65 |
SUPPLY OF RTU & SOER SERVICES @ SAKAKA-C & AL JOUF-B |
Completed |
66 |
SUPPLY OF FR & SOER SERVICES @ VARIOUS S/S'S (MAKE: QUALITROL & AMETEK) |
Completed |
67 |
SUPPLY OF SOER SERVICES @ HVT |
Completed |
68 |
OPTIBAT INTEGRATION SERVICES ON MONTHLY BASIS AT FUJAIRAH CEMENT PLANT, DUBAI. |
Completed |
69 |
SUPPLY OF SERVICES: SITE INSEPECTION OF CAPACITOR PANEL DFM @ ARASCO FEED. |
Completed |
70 |
SUPPLY OF ABB RTU EXP & SOER EXPANSION SERVICES @ PS2 & PS3 |
Completed |
71 |
SUPPLY OF SERVICES: TRANSFORMER LEAK REPAIR AND TESTING @ AL YAMAMA STEEL |
Completed |
72 |
SUPPLY OF GDP, CONTROL MODULE & POWER SUPPLY MODULES FOR D25 BCU's @ ALBA SH6/SH8 |
Completed |
73 |
SUPPLY AND INSTALLATION, TESTING & COMMISSIONING OF 25KVA CAPACITORS |
Completed |
74 |
SUPPLY OF BECKHOFF PLC AND TESTING & COMMISSIONING |
Completed |
75 |
SUPPLY OF RELAY TESTING & MICROSCADA MODIFICATION SERVICES @ SH5-ALBA |
Completed |
76 |
SCADA & SOE EXPANSION WORK of AIN DAR SUB#30 (GE D20 RTU & SOER) |
Completed |
77 |
RAWABI PROJECT - SCADA RTU EXPANSIONS @ S/S 8004(Microsol), S/S 8088 (ABB), S/S 9015 (ABB), S/S 9017 (ABB), S/S 8099 (SIEMENS SAT-PS-5620) |
Completed |
78 |
SUPPLY OF MASTER STATION MODEMS & INSTALLATION WORKS @ SEC DAMMAM |
Completed |
79 |
SCADA & SOE EXPANSION WORK AT SAKAKA-C (GE D20 RTU & SOER) |
Completed |
80 |
SCADA RTU EXPANSION @ 21BD |
Completed |
81 |
SOE CONFIGURATION WORKS @ RABIGH-1 |
Completed |
82 |
SOE CONFIGURATION WORKS @ RABIGH-1 |
Completed |
83 |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF SCADA RTU EXPANSION @ SS 8800 (ABB) |
Completed |
84 |
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF SOER EXPANSION @ AL JOUF 132KV |
Completed |
85 |
AMENDMENT OF SUPPLY OF SCADA & SOER EXPANSION WORKS @ SAKAKA INDUSTRIAL S/S (NEW PO FOR ADDITIONAL WORK) |
Completed |
86 |
D20 RTU services @ S/S 7600 |
Completed |
87 |
Supply of SCADA and SOER system Commissioning works at Rehab 110 kV substation of SEC-West |
Completed |
88 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, TESTING & COMMISSIONING OF RTU & SOE EXPANSION @ VARIOUS S/S'S. |
Completed |
89 |
SUPPLY OF CONFIGURATION, T&C @ SHOFUF RTU & SOE. |
Completed |
90 |
SUPPLY OF DESIGN MANUFACTURING OF BRIDGING AMPLIFIER CABINET |
Completed |
91 |
SOER Services @ Al Jouf PP & 9025 - Reconfiguration works |
Completed |
92 |
DSM Services @ Rafha-A - Reconfiguration works |
Completed |
93 |
Reconfiguration Services @ Al Jouf RTU & 8905 RTU. |
Completed |
94 |
SUPPLY OF SCADA & SOER EXPANSIONS AT VARIOUS S/S'S |
Completed |
95 |
SUPPLY OF SOER SYSTEM @ SADAF |
Completed |
96 |
SUPPLY OF SERVICES ALONG WITH GE D200 FIRMWARE & FO CONVERTERS @ ABQAIAQ SUB 50 |
Completed |
97 |
SUPPLY OF SCADA & SOER EXPANSION WORKS @ SAKAKA INDUSTRIAL S/S |
Completed |
98 |
SUPPLY OF SOER SERVICES @ RABIGH-2 S/S |
Completed |
99 |
SUPPLY OF SCADA RTU MODIFICATIONS AT S/S'S 8916, 8917, 8918 & AL JOUF |
Completed |
100 |
SUPPLY OF SCADA RTU MODIFICATIONS AT S/S’s 9008, 8136, 8119, 8099 & 8028 |
Completed |
101 |
SUPPLY OF SCADA RTU & SOER MODIFICATIONS AT MAHASEN |
Completed |
102 |
SUPPLY OF SCADA RTU & SOER MODIFICATIONS AT ABQAIQ |
Completed |
103 |
SUPPLY OF SCADA RTU MODIFICATIONS AT SS 8505 |
Completed |
104 |
Supply of RTU & SOE Services @ West Region S/S's Thuwal, HVE & Rabigh. |
Completed |
105 |
SUPPLY OF ABB SOE MODIFICATIONS AT NABAJ S/S |
Completed |
106 |
SUPPLY OF ACDB & DCDB PANELS FOR S/S 7037,7053 & 7345 |
Completed |
107 |
SUPPLY OF S/S’s 7034 & 7059 SCADA RTU EXPANSION WORKS |
Completed |
108 |
SUPPLY OF S/S’s 7022, 7110 & 7151 SCADA RTU EXPANSION WORKS |
Completed |
109 |
SUPPLY OF ACDB & DCDB PANELS FOR S/S 7034 & 7059 |
Completed |
110 |
Design & Commissioning Services of SCADA RTU @ AL NAGA S/S |
Completed |
111 |
Design, Supply & Commissioning Services of SCADA RTU & SOER @ Manifa |
Completed |
112 |
SUPPLY OF PLC & SERVICES |
Completed |
113 |
Design, Supply & Commissioning Services of SCADA RTU & SOER @ ABU HADRIYAH 380KV |
Completed |
114 |
Design, Supply & Commissioning Services of SCADA RTU & SOER @ TABARJAL S/S |
Completed |
115 |
Design, Supply & Commissioning Services of SCADA RTU @ AL JOUF PP S/S |
Completed |
116 |
REPLACEMENT OF RONAN SOER AND ADDITION OF MMI IN SEVERAL SUBSTATIONS. (SUPPLY OF 6 SOER'S & 3 MMI'S) |
Completed |
117 |
SUUPLY OF SERVICES - PROTECTION MODIFICATION AT S/S 7708 SERVICES |
Completed |
118 |
SUPPLY OF SCADA RTU & SOER Expansions @ QURAYAT GEN#1 RTU & QURAYAT WEST RTU & SOER. |
Completed |
119 |
SUPPLY OF SCADA RTU & SOER Expansions @ DAMMAM PP, GHUNAN, IBN KHAODOUN, KHOBAR BSP & THUQBAH. |
Completed |
120 |
AL MUHAIL NORTH PFC South - RTU extension commissioning Services |
Completed |
121 |
JBBA / OMAN - Substation Automation System services |
Completed |
122 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, TESTING & COMMISSIONING OF SCADA SYTEM FOR NEW 33/13.8KV SUBSTATION # 7212 (Majma’ah) - RTU + INTERPOSING RELAY CABINET & DATA PART SYSTEM |
Completed |
123 |
SUPPLY OF DESIGN, ENGINEERING, MATERIAL, TESTING & COMMISSIONING OF SOER SYTEM FOR DOMAH-A |
Completed |
124 |
SUPPLY OF S/S’s 7037, 7053 & 7345 SCADA RTU EXPANSION WORKS |
Completed |